Used 2019 Bmw M2 Coupe
$45,880
Financing as low as $750 per month.
Key Features
Mileage
0
Drivetrain
AWD
Engine
3L 6 Cylinder
Transmission
Manual
Fuel Type
Gasoline
MPG
18 / 25
Color
Hockenheim Silver Metallic / Black W/Blue Stitching
Title
Clean
Contact Seller
Au
Dealer Description
The Vehicle Records are unavailable for this vehicle. CARFAX 1-Owner. Personal Use. 4 Service Records. No Accident or Damage Reported. The number of owners is estimated. See the full CARFAX Report for Additional information and glossary of terms.
Features & Options
- Back-Up Camera
- Collision Mitigation-Front
- Curtain 1st And 2nd Row Airbags
- Driver And Passenger Knee Airbag
- Driver Monitoring-Alert
- Dual Stage Driver And Passenger Front Airbags
- Frontal Collision Warning w/City Collision Mitigation
- Lane Departure Warning
- Park Distance Control Rear Parking Sensors
- Side Impact Beams
- Tire Specific Low Tire Pressure Warning
- Navigation System
- Heated Front Seats
- Leather Seats
- Power Driver Seat
- Power Passenger Seat
- Seat Memory
- Bluetooth Connection
- Premium Sound System
- Satellite Radio
Vehicle History Report
VIN: WBS2U7C55K7D07814
Check this vehicle's history for accidents, service records, ownership, and more.
Contact Seller
Au